To the central content area

Pingtung County Livestock Manure Centralized Treatment Demonstration Subsidy Collection, Treatment and Recovery Ammonia Nitrogen Project (Planning and Design) in 2020

Absrtact
The main purpose of this project is to reduce the water pollution caused by livestock and citizen sewage in the upper reaches of Long-Jing Creek drainage, and cooperate with the Long-Jing Creek waterfront environment construction project of the Hakka Affairs Office of Pingtung County to avoid poor perception of the waterfront environment of Long-Jing Creek due to water quality and odor problems. This project sets up a water purification field has 10,000CMD average daily treatment, and the inlet water quality of BOD, SS and NH3-N are 24 mg/L, 59 mg/L and 20 mg/L respectively. And treatment efficiency of the water purification field, BOD reduction rate is about 83.25%, the SS reduction rate is about 87.25%, and the NH3-N reduction rate is about 86.39%. As the natural ecological method of on-site treatment, this plan takes water quality purification as the main axis, reduces river pollutants, improves people's quality of life, restores river self-purification ability, improves nearby ecological environment and other environmental benefits, and takes ecological education, environmental friendliness, resource-based and sustainable development as the project’s goal.
Keyword
Long-jing creek, Water purification field, Ecological engineering method
Open
top